Cómo nace una casa Kager?: todas las etapas

What are the stages of the construction of a Kager house?

From the verification of the architectural project to the construction of the key in one hand, in this article we have summarized the main stages of the path that you will take to enter your new house of wood.

Contractual phase

EVERYTHING YOU HAVE TO CHOOSE

1. Feasibility analysis

 

El camino que lleva a la creación de una nueva casa de madera Kager comiaenza siempre a partir de la proyecto architectónica validation. The project delivered to us is analyzed by our technical office, which verifies its viability according to the construction specifications of the Kager technology.

 

2. Choice of finishes

Gracias a nuestras oficinas y showrooms en la zone, le acompagnamos paso a paso en la elección de los acabados que harán única su nueva vivienda. Fieles a nuestro enfoque de personalización total del proyecto, prestamos grand atencio incluso a los detalles más pequeños para satisfier todas las expectativas. Cualquier solución no presente entre las propuestas actualmente disponibles podra ser desarrollada ad hoc por nuestro department técnico.

 

 

3. Submission of the budget

 

With the information compiled in these two primeros pasos, we are in conditions of elaborating a complete budget for the construction of your new home.

Each Kager budget is elaborated following our policy of total transparency and certainty of costs, to deliver a clear, comprehensible and surprising document to the client. Para saber más, lea nuestro focus en profundidad “Presupuestos de casas de madera: ¿cómo leerlos?”: "Wooden house estimates: how to read them?" .

 

 

4. Signing the contract

 

Si nuestra propuesta es aceptada, la primera fase del proceso que conducirá a la delivery de su casa de madera Kager finaliza con la firma del contrato. A partir de ese momento, la atención de nuestro equipo pasa a la fase de diseño.

 

 

DESIGN PHASE

ADIÓS PREOCUPACIONES, NUESTRO EQUIPO SE ENCARGARÁ DE TODOS LOS ASPECTOS

5. Executive design

 

Each home we create is a custom-made project, unique and inimitable: that's why our technical office dedicates maximum attention to each project for the study and definition of each detail. Then, the designs were sent to the Kager factory for the production of the walls. The precise implementation of the executive project is our brand of factory and facilitates the posterior assembly phase, which allows us to respect the times planned for the construction of your new home.

 

 

6. Load analysis

 

El análisis de cargas serves to define the specifications of each structural element, por lo que representa uno de los pasos más importantes del diseño.

This study is carried out by our department of structural engineering, formed by personnel specialized in the construction of wooden houses and with an experience of more than 1500 Kager houses constructed in the history of Kager.

 

 

7. Static relationship

 

With the results of the analyzes and stages of design carried out until now, the Certificate of Static Aptitud has been elaborated, a document that also includes the information on seismic safety according to the current regulations and that supposes the last step of authorization to obtain the release of the Building Permit.

 

 

Implementation phase

THE FUTURE IS TAKING FORM

 

8. Factory production

 

La construcción de las paredes de su nueva casa de madera tiene lugar en la fábrica Kager, en un un environment de trabajo controlled y optimizado para garantiar las mejores condiziones laborales a nuestros expertes trabajadores.

In this way, the maximum control of the insulation of the walls is achieved, which benefits the energy efficiency of the house.

This is one of the main advantages of prefabrication. Discover more in our report in depth.

 

 

9. Transport to the construction site

Once the production of all the structural elements of the house is finalized, it is transported to the work site, where the cement slab has already been built, to begin the assembly of the house. It is a process perfected with experience, which guarantees fast and safe times and which is carried out exclusively by our team of specialized workers.

 

 

10. Montaje de la obra bruta avanzada

 

At the end of the construction work of the house, the construction process reaches the so-called advanced construction stage, which includes the construction work of the structures (such as interior and exterior walls, floors, roofs and porches), the plastering of the exterior walls, the roof coating, the plumbing and the line of sight.

Los plazos para completar el trabajo en gross avanzado varied between 3 and 5 semanas, depending on the complexity of the project.

 

 

11. Key in one hand

After the finalization of the advanced bruta work, the following trabajos will be carried out: finalization of the floors and internal and external coatings, creation and painting of the internal plaster, installation of sanitary facilities, taps, showers, internal doors, internal stairs, electrical system, hydrothermosanitario, photovoltaic and VMC system, in addition to the customizations foreseen by the project.

Los plazos para la finalización de las obras y la entrega llave en mano son, por termo medio, de 16 a 20 semanas.

 

 

 

Esta es la última etapa de un periplo en el que han 150 experts, entre ingenieros, arquitectos y obreros specializedos. The new home of the Kagers is already ready to welcome them.

 

 